Technical Report | Technical Drawings

A 55 page technical report was submitted alongside the Walworth Interchange studio brief, specifically focused on sections and detailing of proposed hard, soft and water features. The three sections of Site History, Design and Technical included AutoCAD diagrams ranging from scale 1:50 to 1:1; SuDS strategy and water schematic; planting scheme; and material selection.

Please feel free to contact me for a copy of the full report.

Project Completion: April 2017


 

 


 

 


 

 


 

 

 


 

 


 

 


 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s